When a coal-fired power plant was experiencing startup problems with a boiler-feed pump, the plant wanted to fix the issue during an overhaul. A John Crane 48VBF seal upgrade improved the boiler feed pump startup and saved the plant more than US$20,000 by eliminating the need for a separate cooling system.