John Crane - John Crane’s Managed Reliability Program Saves Colombian Oil Pipeline Company More than $7 Million

John Crane’s Managed Reliability Program Saves Colombian Oil Pipeline Company More than $7 Million

In 2013, Colombia’s largest crude oil pipeline operator wanted to reduce the total cost of ownership of its pipeline pumps and other rotating equipment. The pumps were critical components of the pipeline, which travels over 600 miles and is supported by 10 pumping stations. Reliability and maintenance managers knew that increased pump seal mean time between failure cut into maintenance budgets, production and company profits. The pipeline company decided to work with John Crane to take over its seal maintenance efforts to lower costs and increase the pipeline’s efficiency and reliability through John Crane’s Mechanical Seals Reliability Program.

Read the case study here.

几百名工程专家分布在全球200个区域我们通过创新来成就您

Scroll to top